YMCA staff with the outdoor pool hoist, which was installed last year. Picture: Conor Hickey
THE YMCA Oasis has upgraded the facilities at its South Windsor site.
The 25-metre indoor pool has been resurfaced; four new pool side showers have been installed; a renovation of the group fitness room means there is a new timber floor; a new path has been installed to the outdoor pool, as well as some shade sails; and, some new turf and play equipment areas installed outside.
Late last year, the YMCA also installed a pool hoist for the outdoor pool, to help wheelchair bound people enter the water.