North Richmond crossing 'urgently' investigated by RMS after Colo High School P&C complains

By Conor Hickey
Updated May 29 2017 - 2:37pm, first published 2:36pm
The construction site blocks the footpath, with this 'footpath closed' sign. A smaller sign urges pedestrians to use the lights at Grose Vale Road to cross.
The construction site blocks the footpath, with this 'footpath closed' sign. A smaller sign urges pedestrians to use the lights at Grose Vale Road to cross.

COLO High School students will no longer be forced to run across Bells Line of Road during peak hour, after a construction site was cleared to allow pedestrian access along one side of the road.